• User avatar
  • User avatar
  • User avatar
  • User avatar
User avatar
By miket
#10594
My biggest job to date. 32' Albermarle full curtains.
Attachments
100_0035.JPG
100_0035.JPG (1.44 MiB) Viewed 3790 times
100_0034.JPG
100_0034.JPG (1.32 MiB) Viewed 3790 times
100_0033.JPG
100_0033.JPG (1.73 MiB) Viewed 3790 times
John Long, Ddedman liked this
User avatar
By miket
#10610
@John Thanks! It wasn't too bad. The worst part was the small front screen and on the side if you look in the window you can see the bottom of a long storage bin that runs the length of the top. It is on both sides and there is about 3 inches between the bin and the aluminum tubing. Much fun patterning and hanging track.

That is the reason for the flaps at the top of the panels. You can un zip the whole panel from that flap and not have to fight the whole panel up in that gap. Then you can remove zipper flaps or leave them in place, which is what I would do as they are a b!@#$ to get up there. loll

Thanks @vicstric
John liked this

I agree it's usually not a problem but on occasion[…]

Single Faced Basting Tape

Thanks Ron. I was watching a video from Cechaflo […]

Do you have a picture of the corner? Trying to und[…]

The Padded Cell

nice job! :grin: